Fort Worth Certificate of Occupancy: A Guide for Small Businesses

A Certificate of Occupancy (CO) is the city's confirmation that a building is safe and legal for the type of business using it. In Fort Worth every business with a physical address needs a CO — a new one even when the previous tenant ran the same type of business, and a "Change of Use" CO when the prior business was a different type. The CO is issued after required building, fire and health inspections pass, so it sits on the critical path of your opening date.

New CO versus Change of Use

If you take over a space that was already the same type of business, you still apply for a new CO in your name — the prior owner's CO does not transfer to you. If the previous business was a different type (for example, a retail shop becoming a restaurant), you need a Change of Use CO, which can trigger additional review because the building's approved use is changing. A Change of Use often means more inspections and a longer timeline, so confirm the prior use early.

What the application involves

You apply through the city's development or building department, typically with your lease or proof of ownership, a description of the business use, and a site plan. If you are doing any construction or build-out, the building permit and inspections for that work run before the CO can be issued. Plan the CO application alongside any construction so the two do not block each other.

Inspections that gate the CO

Before the CO is issued, the city schedules and passes the inspections tied to your use — commonly building, fire and health. Food businesses carry additional health inspections, and some trades carry state licensing on top, as covered in do I need a business license in Tarrant County. Schedule inspections only after the permitted work is complete and the space is accessible, and keep records of passed inspections.

Smaller Tarrant County cities

Westworth Village, River Oaks and White Settlement each run their own occupancy or use permits rather than using Fort Worth's CO. The concept is the same — the city confirms the space is legal for your use — but the form, fee and inspection steps differ. Confirm which city handles your address with which Tarrant County city handles my permits before you apply.

Planning your timeline

Build the CO into your opening schedule from the start: confirm jurisdiction, file your assumed name, submit the CO application, complete any build-out, then pass inspections. A CO issued late is the most common reason a small business delays its opening, so start the moment you sign a lease.